检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李迎建[1] 孙慧斌[1] 武迎建[2] 廖传东[1]
机构地区:[1]深圳大学理学院,广东深圳518060 [2]深圳大学建筑与土木工程学院,广东深圳518060
出 处:《重庆建筑大学学报》2006年第2期89-93,共5页Journal of Chongqing Jianzhu University
摘 要:根据近年来深圳地区夏季气候变迁的特征,通过焓差法和数值积分法试差验算在用冷却塔设备的工况变化,分析设计工况和超设计工况条件下的冷却塔气液比、冷却水温和传递单元数与气候条件的关系,得出满足该冷却塔出口水温θ=32℃的气候条件是t=34℃,φ=0.78,并试差计算该冷却塔在超设计工况运行条件下的冷却水温度。Based on the characteristic of summer weather variance in recent years in Shenzhen region, this paper calculated and examined the working condition change of the cooling tower facility in use by the enthalpy potential method and the numerical integration method. The relationship between the weather condition and air -water radio, cooling water temperature and delivery -unit number of the cooling tower, under design working condition or beyond design working condition were analyzed. The weather condition t= 34℃ and ψ = 0.78 for exit water temperature θ=32℃ of this cool- ing tower was obtained based on the analysis results. The exit water temperature of this cooling tower beyond design working condition was calculated by try and error method.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.238