新安江大坝溢流面弹性环氧砂浆现场试验  被引量:2

Site tests of elasticity epoxy mortar on the spillway of Xin'anjiang hydropower dam

在线阅读下载全文

作  者:张运雄 周华文 孙志恒[2] 方文时[2] 鲍志强[2] 

机构地区:[1]新安江水电厂,浙江建德311608 [2]中国水利水电科学研究院,北京100044

出  处:《大坝与安全》2006年第2期31-34,共4页Dam & Safety

摘  要:新安江水电站溢流坝溢流面老环氧砂浆涂层出现了脱空、开裂等缺陷。为了研究弹性环氧砂浆大面积施工工艺和可能遇到的质量问题,进行了三次现场试验。介绍了这三次现场试验情况,总结出弹性环氧砂浆大面积施工中可能影响施工质量的因素,并对原材料选择、砂浆配方和施工工艺等进行了优化,摸索出一套适合于现场大面积施工的施工工艺。通过一年多的运行考验,证明第三次弹性环氧砂浆现场试验取得了成功,达到了预期的效果,为今后采用弹性环氧砂浆处理大面积抗冲磨工程的应用打下良好基础。Defects of the escape and cracks of the old epoxy mortar facing on the spillway of the Xin'anjiang dam were discovered during the inspection. Three times site-tests have been carried out in order to study the potential problems and construction technology in applying the elasticity epoxy mortar on a large area. This paper introduces the field test conditions of three ones.It summarizes the possible affecting factors for construction quality during the application of the elasticity epoxy mortar on large area, and optimizes the selection of raw material, composition of epoxy mortar and construction technology, The whole technology for construction of epoxy mortar on large area have been found out. The third test on site was proved to be successful by more than one year's operation, with the anticipative effects achieved, On the good basis of the test, the elasticity epoxy mortar will be extensively applied on large area for resisting the abrasion in the future.

关 键 词:新安江大坝 弹性环氧砂浆 施工工艺 溢流面 抗冲磨 

分 类 号:TV432[水利工程—水工结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象