检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]广州市市政工程安全质量监督站,广东广州510050 [2]同济大学桥梁工程系,上海200092
出 处:《桥梁建设》2006年第2期50-53,共4页Bridge Construction
基 金:国家自然科学基金项目(50408037);中国博士后科学基金项目(2003034279)
摘 要:采用空间非线性有限元对某预应力混凝土斜拉桥的施工加载过程进行了分析,结合有限元步进法、一阶分析法和按龄期调整的有效模量法,编制了相应的计算程序。根据该桥实际划分的施工时段,计算桥梁从施工到成桥任一时刻主梁和主塔受力和变形状态,并提出了一些有益的建议。The spatial nonlinear finite element is used to analyze construction loading process of a prestressed concrete cable stayed bridge. By way of step-by-step method of the finite element, the first-order analysis method and effective modulus method based on concrete age adjustment, the corresponding computation program is compiled. Further in the light of the actually-divided construction stages of the bridge, the mechanical behavior and deformation conditions of the main girder and pylons of the bridge at any time from the construction stage to completion stage are computed, and accordingly some helpful proposals are put forward as well.
分 类 号:U448.27[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.112