防渗涂料在蔺河口碾压混凝土拱坝中的应用  被引量:3

The Application of the Impermeable Dope Constructional Technique in RCC Arch Dam for Linhekou Hydropower Station

在线阅读下载全文

作  者:冯海波 罗永葵[2] 

机构地区:[1]中国水利水电建设工程咨询公司,北京100011 [2]中国水电顾问集团成都勘测设计研究院,四川成都610072

出  处:《水力发电》2006年第3期33-34,共2页Water Power

摘  要:蔺河口碾压混凝土拱坝以二级配富胶凝材料碾压混凝土及变态混凝土自身作为防渗体为主,大坝死水位以下涂刷LJP型合成高分子防渗涂料,作为辅助防渗措施。通过涂料材质性能试验,证明该涂料可以满足施工需要,并可以简化防渗结构,方便施工,大坝自2003年10月27日蓄水运行以来,防渗效果良好。This paper introduces mainly the properties of the impermeable dope and its application in the construction of RCC arch dam for Linhekou Hydropower Station. As a supplementary impermeable measure, it strengthened the impermeability of the two-grade rich colloid material and made it possible in the use of metamorphic concrete in upstream section of the RCC dam. So it simplified the impermeable structure of the RCC dam, and made the construction convenient. The effect of the seepage control is satisfactory since the filling of the reservoir on October 27,2003.

关 键 词:碾压混凝土拱坝 防渗涂料 施工技术 蔺河口水电站 

分 类 号:TV223.4[水利工程—水工结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象