检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国水电顾问集团中南勘测设计研究院,湖南长沙410014
出 处:《水力发电》2006年第3期60-62,共3页Water Power
摘 要:龙滩水电站发电地下洞室群围岩锚固设计中,为确保洞室群围岩稳定、提高支护材料耐久性、加快施工进度、简化施工工艺,根据设计论证,通过现场试验,已成功地采用了水泥药卷预应力锚杆和无粘结防腐预应力锚索、喷钢纤维混凝土、喷聚丙烯微纤维混凝土等新材料和新工艺。这保证了工程质量,确保了发电工期。During the anchorage design of the underground powerhouse surrounding rocks of Eongtan Hydropower Station, In order to guarantee steady of surrounding rocks, raise the endurance of support material, speed up constrction and simplification constrction technique, On the basis of design demonstration, By means of on-site test, New materials and new techniques such as cement-roll prestressed bolt, preservation non-bond prestressed tendon, steel fibre shotcrete and polypropylene fibre shotcrete have been adopted successfully. So it guarantees the project quality and the generation schedule and has the tremendous economic results.
关 键 词:围岩锚固 水泥药卷 预应力锚杆 无粘结预应力锚索 钢纤维 聚丙烯微纤维 喷射混凝土 龙滩水电站
分 类 号:TV554.12[水利工程—水利水电工程] TV554.13
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.85