三峡大坝泄2号坝段水平位移变形性态分析  被引量:4

Deformation Behavior Analysis for Horizontal Displacement of Flood Sluicing Section 2 of Three Gorges Dam

在线阅读下载全文

作  者:周扬[1] 

机构地区:[1]中国长江电力股份有限公司检修厂,湖北省宜昌市443002

出  处:《水电自动化与大坝监测》2006年第2期55-57,74,共4页HYDROPOWER AUTOMATION AND DAM MONITORING

摘  要:基于三峡大坝关键监测部位——泄2号坝段实测坝顶水平位移较大的情况,对其在初期蓄水及运行过程中水平位移变形性态进行了定性分析,并结合统计回归模型进行了变形原因分析。结果表明,泄2号坝段结构和工作性态正常,为三峡大坝安全运行提供了依据。Concerning of relatively big horizontal displacement of the crest of flood sluicing section 2, which is the vital position of Three Gorges dam, the deformation behavior for horizontal displacement during the initial water storage and operation process is qualitatively analyzed. And the causes of the deformation are analyzed through a regression model. The result shows that the structure and behavior of flood sluicing section 2 is normal, and provides reference for safety operation of Three Gorges dam.

关 键 词:大坝 水平位移 变形分析 

分 类 号:TV698.11[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象