软土地铁盾构法隧道工程风险识别与应对  被引量:16

Risk identification and handling in the shield tunneling of metro in soft soil

在线阅读下载全文

作  者:周红波[1] 何锡兴[1] 蒋建军[2] 蔡来炳[1] 

机构地区:[1]上海建科建设监理咨询有限公司,上海200032 [2]四川省交通厅公路规划勘察设计研究院,成都610041

出  处:《现代隧道技术》2006年第2期10-14,共5页Modern Tunnelling Technology

摘  要:结合上海地铁7号线工程,提出以动态风险识别过程为主线、以静态风险识别为手段的风险识别方法,对地铁盾构法隧道工程建设的风险进行了识别。在风险识别的基础上,结合以往软土隧道工程建设的实践经验、数据资料以及隧道工程理论,重点研究了盾构法隧道工程实施过程中一些典型风险的应对措施。另外,对跨越黄浦江段隧道、联络通道等特殊工程的风险进行了详细的分析与研究。Based on Shanghai metro M7 line project, a risk identification method is put forward which takes dynamic risk identification process as the mainstream and static risk identification as the tool. The method was applied to the risk identification for the above - mentioned project. On the basis of risk identification incorporating the practical experience in soft ground tunneling, available data and literatures as well as the tunnel engineering theories, risk handling measures for some typical risks in the process of shield tunneling are studied. In addition, the risks of Huangpu Rivercrossing tunnel and communication galleries between the up line tunnel and down line tunnel are analyzed in detail.

关 键 词:地铁隧道 盾构法 风险识别 应对措施 

分 类 号:U231.3[交通运输工程—道路与铁道工程] U455.43[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象