1000MW超超临界机组主机设计的主要技术条件  被引量:8

Main Technical Conditions for Design of Main Equipment of 1000MW Extra Supercritical Units

在线阅读下载全文

作  者:钱海平[1] 

机构地区:[1]浙江省电力设计院,杭州市310014

出  处:《电力建设》2006年第4期1-4,共4页Electric Power Construction

摘  要:我国1 000 MW超超临界机组主要有上汽-SIEMENS机型、东汽-日立机型及哈汽-东芝机型。超超临界机组在低负荷时能滑压运行,故有良好的低负荷运行性能,其主汽压力可随着负荷的降低而降低。1 000 MW超超临界机组锅炉一般采用八角双切圆燃烧或前后墙对冲燃烧方式,主要采用Π型布置和塔式布置。汽轮发电机组采用四缸四排汽,单轴布置。The 1 000 MW extra - supereritical units in China are mainly Shanghai Turbine Manufactured - Siemens, Dongfang Turbine Manufactured - Hitachi and Harbin Turbine Manufactured - Toshiba models. The units can be operated under sliding pressure and have good low load performance. Their main steam pressure can be reduced with reduction of the load. The 1 000 MW boilers adopt normally the octagonal double - tangential circular combustion or front - rear - wall symmetrical combustion mode and mainly take "P - shape" or tower shape configuration. The turbine - generator units are mainly 4 - casing, 4 - exhausting, single shaft arrangement.

关 键 词:超超临界机组 锅炉 汽轮机 蒸汽参数 材料 管道 

分 类 号:TK222[动力工程及工程热物理—动力机械及工程] TK262

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象