检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王茂成 顾芹[2] 雍军[3] 沈庆河[3] 李士锋 赵洪远
机构地区:[1]烟台电力设计院,山东烟台264002 [2]中国人民银行烟台市中心银行,山东烟台264001 [3]山东电力研究院,山东济南250002 [4]山东电力咨询院,山东济南250013 [5]潍坊电力设计院,山东潍坊261001
出 处:《中国电力》2006年第4期29-33,共5页Electric Power
摘 要:提出山区大跨越段的220 kV定型双回直线塔塔头尺寸应优化设计,将V形串应用到双回直线塔(最大使用档距650 m)的上导线,塔头处避雷线对上导线的保护角可减少9.88,°档距中央避雷线对上导线的保护角可减少13.3,°从而有效降低绕击率。V形串单支复合绝缘子可比常规长300 mm,根据不平衡绝缘原理减少线路型氧化锌避雷器的安装数量。Puts forward that 220 kV double circuit tangent tower must be optimum designed on big across of mountainous region, the "V" string being installed upper conductor on double circuit tangent tower (max span is 650 m), the upper conductor protected angle may reduce 9.88°on tower, and reduce 13.3°between span center. The length of composite insulator on "V" string may be more 300 mm than common composite insulator, therefore reduce back strike probability of upper conductor; according to unbalanced insulation principle, may reduce the installed amount of line surge arrester,
关 键 词:大跨越段 220kV 双回双分裂直线塔 V形串 设计优化
分 类 号:TM753[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.140.197.130