大花水双曲拱坝碾压混凝土配合比试验及施工质量控制  

The Concrete Mix Ratio Test and Quality Control for the RCC of the Dahuashui Double Curvature Arch Dam

在线阅读下载全文

作  者:叶晓培 张千里[1] 

机构地区:[1]武警水电第一总队四支队,广西南宁530222

出  处:《水力发电》2006年第4期25-27,共3页Water Power

摘  要:大花水水电站拦河大坝为碾压混凝土抛物线双曲拱坝+左岸重力墩,拱坝高134.50 m,由于拱坝和重力墩结构复杂,施工质量的控制是施工中的重点。根据不同部位的结构需要,采用了不同的配合比。从已浇筑的混凝土来看,所采用的配合比满足设计要求,所采取的质量管理措施对大坝施工质量控制起到了保证作用。The darn of the Dahuashui hydroelectric project is a RCC double curvature arch dam with gravity buttress on the left bank with a dam height of 134.50m. Due to the structural complexity of the arch dam and gravity buttress, the quality control of the construction work must be attached to great importance. Different mix ratios are applied according to the requirement of structures at different localities. The results gained from concreting show that the mixture proved satisfactory and the quality of construction work was secured.

关 键 词:碾压混凝土双曲拱坝 配合比试验 质量控制 大花水水电站 

分 类 号:TV523[水利工程—水利水电工程] TV74

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象