检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]四川大学,四川成都610065 [2]黑龙江省水利水电勘测设计研究院,黑龙江哈尔滨150080
出 处:《水利水电技术》2006年第4期19-21,共3页Water Resources and Hydropower Engineering
摘 要:松花江依兰航电枢纽的主泄洪闸闸墩和引航导堤堤头都是流冰冰排主要作用的结构或部位,将其作为计算对象,用国内外有关计算公式对其承受的冰荷载进行初步校核,并比较所搜集的冰荷载计算公式对当前枢纽工程结构的适用性,选择出适于松花江冰情特点的计算公式。So far as Yilan Navigation and Hydropower Project on Songhuajiang River is concerned, the piers of the main flood discharge sluice and the head of the training dyke for the approach channel of the ship lock are the structures and locations mainly forced by the pack of the drift ice therein; which are taken as the calculation object, the ice loads on them are preliminarily checked herein with the related formulae at home and abroad, and then the formula suitable for the feature of the ice regime of Songhuajiang River is found out in accordance with the comparison of the applicabilities of all the collected formulae for the calculation of the ice loads to the engineering structures of the project concerned.
分 类 号:TV61[水利工程—水利水电工程] TU312.1[建筑科学—结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117