检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]解放军理工大学工程兵工程学院,江苏南京210007
出 处:《解放军理工大学学报(自然科学版)》2006年第2期148-152,共5页Journal of PLA University of Science and Technology(Natural Science Edition)
摘 要:为了研究地下防护工程坑道中金属门对电磁波的屏蔽作用,建立了简化的计算模型,以矩形波导中TE10模和TM11模作为激励模式,运用时域有限差分法计算了金属门的屏蔽效能,分析了门框嵌入岩土介质深度、门缝大小以及贯穿导线对屏蔽效能的影响。结果表明,门框嵌入岩土介质一定的深度,可有效提高屏蔽效能;门缝的存在对屏蔽效能有较大影响,门缝大小变化时对屏蔽效能影响不大;门框外侧的贯穿导线对金属门的屏蔽效能影响非常小,贯穿导线越靠近坑道中央,对屏蔽效能的影响越大。In order to investigate the shielding effect of the metallic door on electromagnetic wave, the model of rectangular tunnel in protection engineering was established. With the FDTD(finite-difference time-domain) method, electromagnetic shielding effectiveness(SE) were studied for the TE10 and TM11 modes. Factors affecting the SE were analyzed. The results indicate that shielding effectiveness is improved when the doorframe is embedded to certain depth in the rock and soil media. The slot on the metallic door degrades the shielding effectiveness, but the shielding effectiveness varies little with different widths of slot. The penetrative wire beside the doorframe has almost no effect on shielding effectiveness and the affection of the wire becomes great when it is close to tunnel's center.
分 类 号:TN011[电子电信—物理电子学] TM153[电气工程—电工理论与新技术]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15