检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]华东电力调度交易中心,上海200002 [2]华东电力试验研究院,上海200437
出 处:《华东电力》2006年第4期20-22,共3页East China Electric Power
摘 要:由500 kV G IS隔离闸刀操作而引起的特高频暂态过电压(VFTO)是大电网安全运行的重要隐患之一。通过EMTP软件仿真和华东天荒坪抽水蓄能电厂现场实测,研究了VFTO产生的原因与机理,讨论了现有的VFTO应对措施,首次提出了不改造现有设备的条件下,减少VFTO及其影响的电气调度操作的反措方法,并通过运行实践验证了反措的有效性。VFTO is one of the most important hidden troubles in modem grid caused by operations of 500 kV GIS disconnecting switch. This paper analyses VFTO' s origin and mechanism by using EMTP program and actual measures of operational sites. The paper also describes the existing methods against VFTO focusing on facilities reconstruction and compares their effects with each other. Furthermore the paper introduces a new method to decrease VFTO where facilities reconstruction is not necessary. Practices proved that the new way is effective.
分 类 号:TM864[电气工程—高电压与绝缘技术]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117