焦炭塔堵焦阀接管部位的应力计算及高温应力测定  被引量:1

Stress calculation and high temperature stress measurement at the nozzle zones of the coke block valve in a coke tower.

在线阅读下载全文

作  者:王庆华[1,2] 黄振仁 成建国[1,2] 高向东 徐平 吴振康 

机构地区:[1]南京化工大学 [2]南京炼油厂

出  处:《化工机械》1996年第4期30-32,共3页Chemical Engineering & Machinery

摘  要:为算出一座焦炭塔堵焦阀接管处的管端推力(矩)数值及塔体接管部位的应力,特选用等值刚度法FAOP及有限元法MSC两个标准程序分别对该塔的高温进油管系及塔体接管部位进行了柔性分析及应力计算。为了验证计算方法的正确性,还在接管部位用电测法进行了高温应力测定试验。A flexiable analysis and a stress calculation were respectively conducted for the high temperature oil feed pipelines and the nozzles of a coke tower cylinder by using the equivalent stiffness method FOAP and the finite element method MSC to calculate the numerical value of the tube end thrust force moment at the nozzles of the coke block valve and the stress of the nozzles of the coke tower.Besides,a high temperature stress measurement experiment was conducted at the nozzle zones by using the electric measurement method to verify the calculation correctness.The result showed that the two values were in good agreement.

关 键 词:焦炭塔 堵焦阀 应力计算 高温 焦化 石油炼制 

分 类 号:TE962.02[石油与天然气工程—石油机械设备]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象