检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国电力企业联合会电力可靠性管理中心,北京100761
出 处:《中国电力》2006年第5期5-11,共7页Electric Power
摘 要:通过对2005年全国100MW 及以上容量火电和40MW 及以上容量水电机组、200MW 及以上容量火电机组5种主要发电辅助设备可靠性的计划停运、非计划停运及主要影响因素进行分析与评估,特别是通过近几年的指标分析比较,提出影响可靠性因素的变化趋势,为提高发电企业可靠性管理提供了有益的依据。Based on the national statistical investigations on reliability indexes including the thermal power units of 100 MW and above, water power units of 40 MW and above, the five main auxiliary power equipment of the thermal power plant units of 200 MW and above, the effect factors contributing to the planned and unplanned outage were analyzed and evaluated. In addition, the trend influencing the reliability was proposed by means of the statistic index comparison of recent years. This provides an useful basis to improve the reliability management of power utilities.
分 类 号:TM732[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.148.255.182