检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]铁道第二勘察设计院电化处
出 处:《电气化铁道》2005年第6期11-13,共3页Electric Railway
摘 要:电气化铁道牵引变电所不停电改造施工中采用移动高压室供电,既可保证牵引变电所的正常运行,又可将原高压设备退出运行进行停电改造。本文介绍了移动高压室的结构及一、二次设备选型,并以株六复线为例进行计算,通过实际数字进行效益分析。The movable high voltage room is adopted on the traction substation of the electrical railway in order to execute uninterrupted power supply reconstruction. This method can not only keep the function of the traction substation in gear, but also can retreat off the old high voltage equipment, then implement the alteration on the power off state .In this thesis, the configuration of the movable substation and the choice of the equipments of high and low voltage is introduced. At the same time, as an example in Zhu- Liu railway, the calculation is carded through, the efficiency is analyzed by the actual number.
分 类 号:U227.8[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117