小断面过海隧道泥水盾构施工技术  

onstruction Technology of Small Cross-section Sub-sea Tunnel by means of Slurry Shield Machine

在线阅读下载全文

作  者:张学军[1] 谢仁根[1] 马小汀[1] 

机构地区:[1]中铁隧道集团二处有限公司掘进一工程公司,北京燕郊101601

出  处:《隧道建设》2006年第B05期1-4,24,共5页Tunnel Construction

摘  要:结合深圳前湾海底隧道工程,较详细地论述了过海隧道泥水盾构的施工原理和施工方法,包括施工的基本程序和管理基准,重点介绍了盾构始发的准备工作,试掘进应注意的问题及正常掘进中的各种参数控制。Taking Qianwan sub- sea tunnel in Shenzhen as an example, the article presents the construction principles and construction methods of a sub-sea tunnel by means of slurry shield machine, including the basic construction procedures and the construction management criteria. The article places its emphasis on the description of the preparation works for the launching of the shield machine, items which special attention should be paid to during trial boring and the control of various parameters of normal boring.

关 键 词:小断面隧道 泥水盾构 施工 技术 

分 类 号:U455.43[建筑科学—桥梁与隧道工程] U459.5[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象