检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]美国加州交通部 [2]清华大学建设管理系,北京100084
出 处:《建筑经济》2006年第5期42-47,共6页Construction Economy
摘 要:美国政府机构在工程服务采购中通常采用以资质为标准的专业服务采购模式,而在施工采购中通常采用以价格为标准的“大宗商品”采购模式。本文分析了以上两种截然不同的采购模式产生和发展的历史背景,并与我国工程采购中常用的综合评分法采购模式作了比较,从而为发展和完善我国工程采购市场机制提供了借鉴。The federal and state government agencies in US normally adopt Quality-Based-Selection process to choose consultants for their Architectural & Engineering Service Procurement, whereas these a- gencies always use Competitive Bidding process to procure construction projects. This article will review the developing history and related background information of the above-mentioned two procurement models dominantly used in US, and will analyze these models from Market Theory standpoint. This article will also compare the above-mentioned two procurement models with their counterparts in China in an effort to shed lights on the development and reform of engineering procurement models in China.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3