胶材用量及配合比优化后龙滩大坝稳定及抗裂性能研究  

Study on the Stability and the Anti-crack Performances by Temperature Control of Longtan Dam after the Optimization of Cement Amount and Mix Proportion

在线阅读下载全文

作  者:黄淑萍[1] 姜荣梅 凌骐[1] 石端学[1] 

机构地区:[1]河海大学土木学院,江苏南京210098 [2]广西龙滩水电开发有限公司,广西天峨547300

出  处:《水力发电》2006年第5期24-26,共3页Water Power

摘  要:混凝土的胶凝材料用量及温控措施直接影响工程质量和造价,结合龙滩大坝工程实际,通过温度应力仿真计算,重点分析胶凝材料用量减少及配合比优化后温度应力和剪应力的变化,得到胶凝材料减少后,大坝的抗剪安全系数仍可满足设计要求,抗裂能力也没有降低的结论。The cement amount and temperature control measures of concrete will directly affect the quality and cost of the project. In combination with the actual conditions of Longtan Dam Project and on the basis of the simulation calculation of temperature stresses, this paper stresses on the analysis of the changes of temperature stresses and shear stress after the reduction of cement amount and the optimization of mix proportion. The results showed that after the reduction of cement amount, the shear safety coefficient of the dam could satify the requirements of design and the anti-crack performance also do not reduce.

关 键 词:胶材用量 配合比优化 仿真计算 温度徐变应力 大坝稳定 龙滩水电站 

分 类 号:TV315[水利工程—水工结构工程] TU502[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象