梯级水电站短期调峰运行方式研究  被引量:10

Research On Peak Modulation Modes Of Short-term Scheduling For Cascade Hydropower Stations

在线阅读下载全文

作  者:何莉[1] 伍永刚[1] 张勇传[1] 余波[2] 李晖[2] 

机构地区:[1]华中科技大学水电与数字化工程学院,湖北武汉430074 [2]中国长江三峡工程开发总公司,湖北宜昌443002

出  处:《水力发电》2006年第5期71-73,83,共4页Water Power

基  金:国家自然科学基金重点资助项目(50539140)

摘  要:针对三峡梯级电站峰、谷、平典型负荷特征,建立梯级电站同(异)步式调峰和联合调峰模型。模型中考虑上下游电站间水头联系,计及水头损失,增强了调度模型的实用性和合理性。基于逐次逼近算法求解梯级调峰模型,给出了计算步骤。结合算例比较分析调峰模型,得出联合调峰能提高梯级总效益,以及增大调峰幅度不一定减少发电量等结论。Coupled with the characteristics of typical load, this paper establishes the synchronous (asynchronous) and coordinative peak modulation optimal models of cascade hydropower stations. Head loss and relation are included in the models, which greatly improves utility and reasonability of these models. Successive approximation method is directed to solve the peak modulation problems. Finally, A case study is served for demonstrating relative analyses between models and some utility rules is induced.

关 键 词:运行 典型负荷 短期调峰调度 水头联系 梯级水电站 

分 类 号:TM732[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象