中环世贸中心基础结构加固预应力卸载施工技术  被引量:1

PRE-STRESS UNLOADING TECHNIQUE IN FOUNDATION REINFORCEMENT OF ZHONGHUAN WORLD TRADE CENTER

在线阅读下载全文

作  者:高殿民[1] 

机构地区:[1]北京城建四建设工程有限责任公司,北京100083

出  处:《建筑技术》2006年第6期408-411,共4页Architecture Technology

摘  要:北京中环世贸中心工程体量大,工期紧,质量标准高,由于设计改变引起荷载变化,要求在对基础结构进行加固的同时施工上部主体结构,为此采用预应力卸载施工技术,并对其进行数字化监控。通过采取一系列技术措施,做到施工成本低,操作简单,保证了施工质量及进度,降低了安全风险。In Beijing Zhonghuan World Trade Center Project, a project of big quantity, short construction period and high quality requirements, due to the load changes caused by design variation, foundation reinforcement and main body construction must be carried out at the same time. Pre-stress unloading technique with digital monitoring was therefore adopted. A series of technical measures were taken to cut down construction costs, facilitate the construction, ensure the project quality and schedule and reduce construction risks.

关 键 词:基础加固 结构卸载 预应力 

分 类 号:TU746.3[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象