作 者:高殿民[1]
机构地区:[1]北京城建四建设工程有限责任公司,北京100083
出 处:《建筑技术》2006年第6期408-411,共4页Architecture Technology
摘 要:北京中环世贸中心工程体量大,工期紧,质量标准高,由于设计改变引起荷载变化,要求在对基础结构进行加固的同时施工上部主体结构,为此采用预应力卸载施工技术,并对其进行数字化监控。通过采取一系列技术措施,做到施工成本低,操作简单,保证了施工质量及进度,降低了安全风险。In Beijing Zhonghuan World Trade Center Project, a project of big quantity, short construction period and high quality requirements, due to the load changes caused by design variation, foundation reinforcement and main body construction must be carried out at the same time. Pre-stress unloading technique with digital monitoring was therefore adopted. A series of technical measures were taken to cut down construction costs, facilitate the construction, ensure the project quality and schedule and reduce construction risks.
分 类 号:TU746.3[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249