检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国建筑设计研究院,北京010000 [2]河北北方学院校园规划与建设处,河北张家口075000
出 处:《河北北方学院学报(自然科学版)》2006年第2期68-70,共3页Journal of Hebei North University:Natural Science Edition
摘 要:综合教学楼工程在河北北方学院新校区东区建设中地位举足轻重,通过对该工程主要应用的三项新技术措施的先进性和经济合理性分析,得出质量保证、工期提前的物质基础.项目管理班子采用的组织管理措施是技术措施实现的决定性因素.The comprehensive teaching building project is of pivotal importance in the construction of east part of Hebei North University's new school area. By analyzing the advanced quality and economical rationality of the three new technologies applied in this project, the paper draws the conclusion that the three new technologies are the material base of project quality and project limit shortening. The organization management measures, taken by the project management group, is the determining factor of the realization of the technologies.
分 类 号:TU721.2[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.40