检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:庞兴亮[1]
机构地区:[1]沧州市公路工程监理中心,河北沧州061000
出 处:《城市道桥与防洪》2006年第3期17-18,共2页Urban Roads Bridges & Flood Control
摘 要:在公路建设中经常遇到把旧路改建成一、二级公路的情况,针对河北省地区的土质情况,不能直接在零填挖土基上做路面结构层,需对不同类型的土基采取相应处理措施。文中介绍了3种类型土基下路基处理方案的选定过程,并根据不同的试验方法和依据提出了具体的处理方案。In the construction of the highways, there are often the conditions of rebuilding the old roads into Class 1 and Class 2 highways. To counter the soil condition of Hebei Province, the structural course of the pavement can not be directly constructed on the zero filling and excavating ground. The relative treatment measures are taken for the different kinds of the soil ground. The article introduces the selecting processes of the subgrade treatment schemes under three kinds of soil grounds, and puts forward the detail treatment schemes on the different test methods and bases.
分 类 号:U418.8[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.41