检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]南京师范大学电气与自动化工程学院,江苏南京210042 [2]安徽省电力公司,安徽合肥230061
出 处:《南京师范大学学报(工程技术版)》2006年第2期1-7,共7页Journal of Nanjing Normal University(Engineering and Technology Edition)
摘 要:电力市场环境下,输电阻塞的发生概率加大.当间接阻塞管理不能奏效的情况下,只能由直接阻塞管理来消除.在灵敏度法直接阻塞管理的基础上,把用户支付意愿及在IL辅助市场中的中标信息,作为用户用电效能的指标来考虑,提出一种综合直接阻塞管理方法.并采用层次分析法(AHP)的改进算法广义最小偏差排序方法(GLDM)快速确定节点的负荷削减量.使缓解或消除阻塞后,总的社会福利损失尽可能小.经算例验证,方法有效、可行.In power market, the probability of transmission congestion is increased. When indirect congestion management doesn't work well, direct congestion management should be used. In this paper, a composite congestion management method is presented based on sensitivity-analysis direct congestion management. Consumer' s willingness-to-pay and hitting bid in ILM (Interruptible Load Management) ancillary market are considered as criteria of power supply efficiency. The generalized least deviation sequencing method is used to decide the amount of load shedding. Optimal economic benefit can be achieved by using this method. At last, validity of the method is proved by an example given in this paper.
分 类 号:TM73[电气工程—电力系统及自动化] F123.9[经济管理—世界经济]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.200