检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]同济大学地下建筑与工程系
出 处:《勘察科学技术》2006年第3期11-14,共4页Site Investigation Science and Technology
摘 要:该文根据上海长峰商城特大型基坑逆作法施工中的实测资料,通过绘出立柱桩顶点在楼板各个施工阶段的等值线图,形象直观地反映基坑逆作法施工过程中立柱桩之间以及地下连续墙与相邻立柱桩差异沉降的变化情况,并对差异沉降进行分析和研究。This paper is based on the measurement data of differential settlements, which are collected during reserved construction in Changfeng building of Shanghai. According to the settlement-contour maps of the floor supported by the top of soldier piles and continuous walls in each construction phase, the development of differential settlements between soldier piles and the development of differential settlements between diaphragm walls and adjacent soldier piles are directly reflected. Differential settlement is studied in this paper.
分 类 号:TU745[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15