上海长峰商城逆作法施工中差异沉降的实测研究  被引量:10

Measurement Study of Differential Settlement During Reserved Construction in Changfeng Building of Shanghai

在线阅读下载全文

作  者:钟邑桅[1] 袁聚云[1] 赵锡宏[1] 

机构地区:[1]同济大学地下建筑与工程系

出  处:《勘察科学技术》2006年第3期11-14,共4页Site Investigation Science and Technology

摘  要:该文根据上海长峰商城特大型基坑逆作法施工中的实测资料,通过绘出立柱桩顶点在楼板各个施工阶段的等值线图,形象直观地反映基坑逆作法施工过程中立柱桩之间以及地下连续墙与相邻立柱桩差异沉降的变化情况,并对差异沉降进行分析和研究。This paper is based on the measurement data of differential settlements, which are collected during reserved construction in Changfeng building of Shanghai. According to the settlement-contour maps of the floor supported by the top of soldier piles and continuous walls in each construction phase, the development of differential settlements between soldier piles and the development of differential settlements between diaphragm walls and adjacent soldier piles are directly reflected. Differential settlement is studied in this paper.

关 键 词:逆作法 差异沉降 沉降等值线图 

分 类 号:TU745[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象