火力发电厂贮灰场挡灰坝变形观测  

Deformation Observation on the Coal Cinder Retaining Dam in Thermal Power Plant

在线阅读下载全文

作  者:许筱阳[1,2,3] 邵生俊[1,2,3] 李元科[1,2,3] 刘育生[1,2,3] 

机构地区:[1]西北林学院林学系 [2]西安理工大学水利水电学院 [3]西北林学院苗圃

出  处:《西北林学院学报》1996年第3期86-90,共5页Journal of Northwest Forestry University

摘  要:1995年我国首次利用粉煤灰,采用水力冲填的方式进行了构筑挡灰坝坝体的工业性试验。在施工过程中对坝体进行了变形观测。本文就变形观测网的设立、变形监测的过程、有关数据的采集、整理、分析等做了论述,得出了利用粉煤灰作为建坝材料。The first industrial experimental dam retaining coal cinder was constructed in China in 1995 by using coal cinder itself and hydraulic force instead of soil. A deformation observation was carried out during the construction of the dam.The establishment of the deformation observation network,the procedure of the observation and the data collection and analysis were described.It was suggested that the way to use coal cinder and hydraulic force instead of soil to construct coal cinder retaining dam was practical

关 键 词:火电厂 粉煤灰 挡灰坝 变形观测 

分 类 号:TM621[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象