检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Claudio GARUTI Mario SANDOVAL
机构地区:[1]FULCRUM Engineering Ltd.A Decision Making Engineering Firm
出 处:《Journal of Systems Science and Systems Engineering》2006年第2期189-200,共12页系统科学与系统工程学报(英文版)
摘 要:The objective of this paper is to show that the Analytic Hierarchy Process (AHP) is a very powerful methodology for designing shiftwork schedules. Manufacturing, mining and other large industrial operations often run around the clock and their employees report for work in shifts. The huge number of variables and the amount of knowledge that needs to be structured, integrated and synthesized forces the need for a system analysis process that is able to deal with such complexity. Work flexibility is a very important issue in Chile and in the rest of the world. One of the main problems of a flexible work process is handling shiftwork systems with their economic, health, social, family and environmental consequences.The objective of this paper is to show that the Analytic Hierarchy Process (AHP) is a very powerful methodology for designing shiftwork schedules. Manufacturing, mining and other large industrial operations often run around the clock and their employees report for work in shifts. The huge number of variables and the amount of knowledge that needs to be structured, integrated and synthesized forces the need for a system analysis process that is able to deal with such complexity. Work flexibility is a very important issue in Chile and in the rest of the world. One of the main problems of a flexible work process is handling shiftwork systems with their economic, health, social, family and environmental consequences.
关 键 词:SHIFTWORK scheduling shifts AHR integration multidisciplinary group decision making
分 类 号:N945.1[自然科学总论—系统科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15