检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]浙江科技学院建筑工程学院,杭州310023 [2]杭州广播电视大学城市建设学院,杭州310012 [3]浙江金瑞建筑设计有限公司,杭州310003
出 处:《浙江科技学院学报》2006年第2期103-106,共4页Journal of Zhejiang University of Science and Technology
摘 要:针对一般预应力混凝土管桩施工中常见的偏位、开裂等质量通病,结合某桩基工程中存在的类似问题,分析管桩出现偏位、开裂的原因主要有定位放样有误、压桩速率过快、基坑开挖方法欠妥等,提出了处理问题的三种方法:整体牵引纠偏复位、局部混凝土芯桩补强和承台地梁加强,检测调整后部分基桩的承载力,结果证明达到了预期的处理效果。Since the deviation and cracking of prestressed concrete pipe pile are the typical problems existing in the course of construction, this article analyzes the causes of such problems combining with engineering practices, such as the error during the orientation, the excessive velocity of putting down the pile, improper method of pit-digging and so on, and then puts forward three methods for handling these problems. At last, after checking the bearing capacity of some piles, it indicates that these methods can achieves expectant effects.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.33