二滩拱坝初次蓄水的变位监测反分析  被引量:5

Back Analysis of Displacement Monitoring Results During Ertan Arch Dam Fist Impoundment

在线阅读下载全文

作  者:舒涌[1] 

机构地区:[1]中国水电顾问集团成都勘测设计研究院,四川成都610072

出  处:《水电站设计》2006年第2期34-41,共8页Design of Hydroelectric Power Station

摘  要:简要介绍了在二滩拱坝1998年5月初次蓄水期,通过拱坝垂线和监测网系统,用统计模型和确定性模型理论分析方法,建立了施加于坝体各作用量与坝体受作用后的效应量(变位)间的数学关系;并根据预先计算分析成果,提出了在初次蓄水运行中拱坝变位的参考预报值,实时对二滩拱坝实际工作状态作出安全评判。This paper presents that during the first impoundment of Ertan reservoir in May 1998, mathematic relationship between the loads acting on the dam & the respondent displacements was established by use of statistic model & determined model theoretic analysis method based on the observation results of the plumblines installed in the dam & monitoring network surveying results. Based on previous calculation & analyis results the dam displacement predictive values during the fist impoundment operation were given & Ertam arch dam actual operation was judged safe.

关 键 词:初次蓄水期 拱坝 安全监测 反分析 变位 二滩水电站 

分 类 号:TV698.1[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象