检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]广州市市政工程安全质量监督站,广东广州510050 [2]广西大学土木工程系,广西南宁530004
出 处:《广州大学学报(自然科学版)》2006年第3期54-59,共6页Journal of Guangzhou University:Natural Science Edition
基 金:中国博士后科学基金资助项目(2003034279)
摘 要:对某千米级斜拉桥的施工加载过程进行了分析,结合有限元步进法、一阶分析法和按龄期调整的有效模量法,编制了相应的计算程序.根据该桥实际划分的施工时段,计算桥梁从施工到成桥任一时刻主梁和主塔受力和变形状态,并提出了建议.The cantilever construction process of a thousand-meter scale cable-stayed bridge is investigated. According to the step by step finite element method, first order optimization method and the age adjusted effective modulus method, a computing program is presented in this paper. Based on actual dividing constructed stages of this bridge, Stress and deformation of girders and cable tower at any period of time during the whole construction course are analyzed. Some of useful comments are presented.
分 类 号:U448.27[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.148