千米级斜拉桥主桥施工加载过程分析  

Construction process analysis for the main span of a thousand-meter scale cable-stayed bridge

在线阅读下载全文

作  者:张建民 唐煦明[2] 

机构地区:[1]广州市市政工程安全质量监督站,广东广州510050 [2]广西大学土木工程系,广西南宁530004

出  处:《广州大学学报(自然科学版)》2006年第3期54-59,共6页Journal of Guangzhou University:Natural Science Edition

基  金:中国博士后科学基金资助项目(2003034279)

摘  要:对某千米级斜拉桥的施工加载过程进行了分析,结合有限元步进法、一阶分析法和按龄期调整的有效模量法,编制了相应的计算程序.根据该桥实际划分的施工时段,计算桥梁从施工到成桥任一时刻主梁和主塔受力和变形状态,并提出了建议.The cantilever construction process of a thousand-meter scale cable-stayed bridge is investigated. According to the step by step finite element method, first order optimization method and the age adjusted effective modulus method, a computing program is presented in this paper. Based on actual dividing constructed stages of this bridge, Stress and deformation of girders and cable tower at any period of time during the whole construction course are analyzed. Some of useful comments are presented.

关 键 词:斜拉桥 施工控制 仿真计算 

分 类 号:U448.27[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象