检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李国斌[1] 高亚军[1] 陈月华[1] 闫园园[1] 韩乃斌[1] 张定安[1]
出 处:《水利水运工程学报》2006年第2期13-17,共5页Hydro-Science and Engineering
摘 要:综合比较了韩国工程设计部门提供的和中国水利工程的平底闸堰流、孔流过流量计算式后指出,计算中应考虑河道闸前行近流速水头的影响.进行了韩国Soli河防洪闸设计方案和比较方案的水工模型试验,从防洪的角度来看,比较方案优于设计方案.Differences between formulas applied in engineering design departments of South Korea and in Chinese hydraulic engineering for calculating flow capacity of the flat-bottomed sluices and orifice flow are compared. Results show that influences of the approach velocity head before a sluice should be considered in calculation. Hydraulic model tests for the design scheme and comparison scheme of the floodgate of the Soli River in South Korea are carried out, and the results show that the comparison scheme is better than the design one in terms of flood control.
关 键 词:堰流 孔流 流量系数 过流量 平底闸 水工模型试验
分 类 号:TV66[水利工程—水利水电工程] TV131.61
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117