摘  要:广西乐滩水电站RCC围堰爆破拆除,是乐滩水电站实现2004年发电的控制性项目,其周围环境复杂,任务重,施工工期紧。根据围堰的特点,选择合理的爆破拆除方案,通过试验选择,确定合理的爆破参数,并认真实施,围堰拆除爆破达到安全、快速、高效的目的。Dismantling the RCC cofferdam of Letan hydropower station by blasting is a dominant works for realizing the generation goal in 2004, its environment is complex, the task is heavy, and the construction period is short. According to the characteristics of the cofferdam, a rational dismantling scheme by blasting has been chosen; rational blasting parameters has been determined after testing; and it was executed seriously. As a consequence, the cofferdam was dismantled safely, quickly and high efficiently.

关 键 词:RCC围堰 拆除 爆破技术 乐滩水电站 

分 类 号:TB41[一般工业技术]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象