作 者:张绍松
机构地区:[1]河南省南阳市水利水电建筑工程公司,河南南阳473000
出 处:《西北水电》2006年第2期28-30,共3页Northwest Hydropower
摘 要:三道湾水电站引水发电洞围岩主层为变质砂岩夹千枚状板岩,其岩质较差,地质构造复杂,大部分为Ⅳ类围岩。对此类围岩采用“新奥法”施工方法,即一次支护,二次永久衬砌施工和灌浆处理,并在一次支护完成后进行了收敛量测。且获得了成功,保证施工顺利完成。The adjacent rock of power tunnels for Sandaowan hydropower station is mainly metamorphic sandstone with phyllite slate, and its rock quality is poor with complicated geological structure. It belongs to Grade IV adjacent rock. New Austrian tunneling method was adopted for the primary support, secondary permanent lining and grouting treatment, and the convergence survey was performed after the primary support. It has obtained a successful results to guarantee smooth completion of the project.
关 键 词:新奥法施工 锚喷支护 二次永久衬砌 灌浆处理 收敛量测
分 类 号:TV52[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.200