榆林沟既成坝系加固配套初步研究  

Preliminary Study on Reinforcement and Complement of Yulingou Accoplished Dam System

在线阅读下载全文

作  者:刘立斌[1] 徐乃民 卢照辉 马生祥 雷元静[1] 

机构地区:[1]黄委会绥德水土保持科学试验站,黄委会宣传出版中心

出  处:《中国水土保持》1996年第11期28-31,共4页Soil and Water Conservation in China

摘  要:榆林沟既成坝系加固配套初步研究刘立斌,徐乃民,卢照辉,马生祥(黄委会绥德水土保持科学试验站,陕西绥德718000)雷元静(黄委会宣传出版中心)PreliminaryStudyonReinforcementandComplementofYulingou...Yulingou, with an area of 65. 6km2, is a tributary of middle Wudinghe River. By the end of 1992, the watershed totally preserved 121 silt-arresters with total storage of 33. 03 million m3,which includs 14 key gully control project, the ratio of key gully control projects to dams is 1: 7. 6.For lack of strict mechanism for dam system mangement and developing unreasonably in a long term, the dam projects were silted and destroyed severely. the majority of silt-arresters became danger, the flood prevention ability of dam system decreased greatly, the utilization ratio for production of land behind silt-arresters reduced. According to situation, existing problems,gully features, social & economic conditions of dam system, the paper puts forward two plans of reinforcement and complement and optimizes one through comparative analysis, that is to reinforce and complete 72 dams on the basis of original dam system, which includes 23 new built dams, the ratio of key gully control projects to dams is 1: 6. 9, the flood prevention standard of the watershed iS 200-year rainfall standard, the area of silted land is added up to 359. 9 hm2. The total investment for these projects is 1166 thousand yuan.

关 键 词:榆林沟 水土保持 综合治理 淤地坝 

分 类 号:S157.31[农业科学—土壤学] TV649[农业科学—农业基础科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象