MM5模式中湿方案的不确定性对“03·7”南京暴雨数值模拟不确定性的影响  被引量:3

Influence of Moist Schemes in MM5 on the Uncertainties of "03·7" Heavy Rainfall Numerical Simulation

在线阅读下载全文

作  者:王洪利[1] 张曼[2] 刘明[3] 

机构地区:[1]中国科学院大气物理研究所大气科学和地球流体力学数值模拟国家重点实验室,北京100029 [2]中国科学院研究生院 [3]安徽省马鞍山市气象局,马鞍山243000

出  处:《应用气象学报》2006年第3期346-353,共8页Journal of Applied Meteorological Science

基  金:国家自然科学基金重点项目(40233029)资助

摘  要:利用有限区域非静力MM5模式,分析了显式降水方案对于2003年7月4—5日南京暴雨数值模拟的不确定性影响。采用混合方案模拟此次暴雨时,这种不确定性决定于显式和隐式方案的相互协调性及敏感性;隐式方案基本决定了雨带的整体的空间分布,而显式方案对于降水型及降水量起到一定的调节作用,调节的程度与选择的参数化方案有关;采用隐式方案Grell和KF2模拟此次暴雨时,应考虑不同的显式方案对于降水模拟的不确定性的影响。The weather forecast produced by numerical weather prediction models has been an important means in the operational forecast, however there exists intrinsic uncertainty. This uncertainty is caused by both the ones in the initial conditions and the ones in the numerical model itself. In the process of the numerical prediction, it is important to consider these errors since the nature of the atmospheric dynamics is to amplify errors originating from either of them. At present, with the application of the massive non-conventional data, such as satellite and radar data in the assimilation system, it is possible to produce the relatively more accurate initial fields. Thus, the uncertainty of numerical model may be more important to forecast especially in the various moist physical process schemes. In recent years, with the ever-improving performance of numerical prediction models and ever-increasing computational resources, the explicit schemes are used to forecast the strong precipitation process in the high resolution mesoscale models gradually with hybrid approach. However, what is the role of explicit schemes and what extension they lead to the Meiyu front heavy rainfall forecast uncertainty? All these issues are worth being further studied. In terms of non-hydrostatic MM5, the impact of explicit moist schemes on the uncertainties in the numerical simulation of the "03·7" Nanjing heavy rainfall is investigated. According to the simulated 24 hour accumulated rain spatial pattern and Ts skill of the variance experiments, the uncertainty depends on the explicit and implicit schemes' relative coordination and sensitivity when the hybrid approach is used to describe the cloud and precipitation process. The implicit schemes determine the spatial pattern of the rain bands, while the explicit schemes adjust the local rain pattern and density. The extent to which the rain band adjusted is related to the convective parameterization. The difference in the rates of resolve scale rainfall to total rainfall in diffe

关 键 词:梅雨锋暴雨 不确定性 显式方案 隐式方案 

分 类 号:P457.6[天文地球—大气科学及气象学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象