检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]河海大学水文水资源与水利工程科学国家重点实验室,江苏南京210098
出 处:《水电能源科学》2006年第3期35-38,共4页Water Resources and Power
摘 要:针对感潮河段潮位序列的不一致现象,提出了一种通过提取序列趋势项进行资料一致性修正的方法。针对低潮位系列容易呈“负偏态”分布的事实,介绍了负偏态潮位系列的频率计算方法,提出了一种融入更多潮位过程特征信息的设计潮位过程推求方法,以长江口天生港、徐六泾、外高桥潮位站为例,采用上述方法计算了典型站的设计潮位和设计潮位过程。研究表明,所提出的方法概念清楚、计算简便、适用性强,对类似潮汐河口设计潮位和设计潮位过程计算具有参考意义。Considering the inconsistency of level data in tidal reach,a method correcting the data by drawing the trend equation from its time series was proposed.In accordance with the fact that the skewness coefficient (Cs) of low-tide level series is readily negative,the frequency analysis with negative Cs was introduced.With more characteristic values taken into account,an improved method for deduced design tidal level process was presented.With Tianshenggang,Xuliujing and Waigaoqiao tide stations in the Yangtze Estuary taken as examples,above methods were applied to calculate design tidal levels and design tidal level processes of typical stations.The research results show that these methods are definite in conception,simple in calculation,and applicable to different cases,they will provide reference for the computation of design tidal level and design tidal level process in other estuaries.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.74