检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:梁青[1]
机构地区:[1]华东电网有限公司,上海200002
出 处:《华东电力》2006年第6期35-37,共3页East China Electric Power
摘 要:介绍了备用的分类,引入了负荷备用的概念;分析了华东电网备用管理的现状,揭示了存在的问题;阐述了需求侧管理错峰机制与机组备用、负荷备用的关系,提出了建立一套从备用计划、监视、控制直至评价考核的管理体系的设想;阐述了实施备用监视的思路,介绍了全网机组运行备用监视平台的建设情况。The classification of reserve and the concept of load reserve are introduced, and the status quo of reserve management of East China Power Grid is analyzed with problems pointed out. The relationship among the peak shifting mechanism of DSM and the unit and load reserves is explained, and the idea of establishing a management system covering reserve planning, monitoring, controlling, and evaluating and checking is put forward. The concept of implementing reserve monitoring is illuminated, and the development of operating reserve monitor platform for units throughout the grid is presented.
关 键 词:机组备用 负荷备用 需求侧管理 错峰管理 备用监视
分 类 号:TM732[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.224.21.26