检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘元雪[1] 蒋树屏[2] 蒋再文 聂承凯 帖智武 赵虎生 黄仰收
机构地区:[1]后勤工程学院建筑工程系地下工程教研室,重庆400041 [2]重庆交通科研设计院,重庆400067 [3]重庆高速公路发展有限公司东南分公司,400060 [4]山西省交通规划勘察设计院,太原030012
出 处:《现代隧道技术》2006年第3期6-11,共6页Modern Tunnelling Technology
基 金:获国家自然科学基金(50309017);重庆市科委资助
摘 要:山区隧道由于受地形及展线限制,一些较短的隧道常常选用连拱结构型式。通过黄土连拱隧道的三维弹塑性数值模拟,分析了在左洞施工后,右洞施工对左洞的影响规律。对于本工程,黄土连拱隧道的两洞开挖面的合理距离为30 m。推广而言,对于黄土连拱隧道,两洞的开挖距离应为单洞跨度的3倍。Multi -arch tunnels are often built for driving short tunnels in mountain areas owing to the restriction of geomorphology and route alignment. In this paper, three- dimensional elasto- plastic numerical simulation was carried out for the first multi - arch loess tunnel in China to study the influence of excavation of the right tunnel to the left tunnel which was bored first. It was indicated by the analysis that the reasonable spacing between two main tunnels was thirty meters for this project. In general, the reasonable spacing should be three times of the span of a single tunnel for multi -arch loess tunnels.
分 类 号:U452.13[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222