机构地区:[1]中国人民武装警察部队水电第十支队,四川成都610036
出 处:《水利水电技术》2006年第6期31-32,共2页Water Resources and Hydropower Engineering
摘 要:红叶二级水电站厂房基础建基高程1917.00m以下12m深处的含卵砾石砂层,承载力较低,厚度变化较大(2~4.74m),局部为纯砂透镜体,存在不均一沉降变形问题。采用150kW振冲器进行了处理。加固后,允许承载力由350kPa提高到625kPa,变形模量达到52MPa,地基整体密实度提高,沉降均一,消除了地基的不均匀沉降变形问题。The sand layer with gravel 12 m below the foundation level of 1 917, 00 m for power house of Hongye Hydropower Station Ⅱ not only has a lower bearing force with a larger variation of thickness (2 - 4, 74 m), but also locally contains sand lenticular body with the problem of uneven settlement; for which the consolidation treatment is made with the method of vibroflotation by the vibrator of 150 kW. After the treatment, the allowable bearing force is increased from 350 kPa to 625 kPa and the deformation modulus reaches to 52 MPa; by which the whole compactness of the foundation is enhanced with even settlement and then the un- even settlement is eliminated as well.
关 键 词:厂房 含卵砾石砂层 振冲加固 沉降变形 红叶二级水电站
分 类 号:TV731[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222