检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中铁武桥重工股份有限公司,武汉430052 [2]中铁大桥局集团公司技术处,武汉430050
出 处:《铁道建筑技术》2006年第3期26-29,共4页Railway Construction Technology
摘 要:横跨巴拿马运河第二桥为主跨420 m的斜拉桥,介绍了该桥主跨长且处于强烈地震带情况下确定设计标准时所选用的不同规范,并对该桥潜在的地震风险进行全面的分析,对该桥的主塔结构、斜拉索的造型、桥跨的布局、上部结构进行了研究和设计。The second bridge crossing the Panama Canal is a cable - stayed bridge with a main span of 420 m. Because of the bridge's long main span and the potential for strong seismic activity in the area, several different design codes were used in developing the design criteria for the bridge, all of which are introduced in this article. Besides, This essay also introduces a thorough analysis of the seismic hazards at this site, and the investigation and design of the main tower configuration, the cable configuration, the span layout and the superstructure cross section as well.
分 类 号:U448.27[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117

