检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:高大铭[1]
出 处:《工程勘察》2006年第7期39-42,共4页Geotechnical Investigation & Surveying
摘 要:在软土地区建设高速列车运行线,桩基础变位是控制设计的重要因素,而竖向变位则是以控制沉降量和不均匀沉降为主。为此,岩土工程勘察报告将全线划分为11个地质区段,对各区段选择桩端持力层和桩型,预估了单桩承载力和桩基础的沉降量,提供设计所需的各项参数,并对土的均匀性进行了分析。两年半的沉降观测成果表明,沉降量和沉降差都明显小于允许值。这一经验对于在软土地区建设高速铁路有一定的参考价值。The displacement control is an important factor of pile foundation design in the construction of high speed railway line on soft clay ground, and vertical displacement control is including the settlement and the difference in settlement. So, the engineering field of high speed railway line was split into eleven sub-areas in the report of investigation of engineering. For each sub-area, pile bearing layers and pile types were analyzed and suggested, and the single pile bearing capacity and the settlement of pile foundation were predicted. The uniformity of the soil was analyzed, and parameters of design were also suggested. According to the observation data obtained in last two and a half years, the values of the settlement and the difference in settlement are considerably less than that allowed. The experience of the paper offers the reference for the construction of high speed railway line on soft clay ground.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3