复杂工程地质条件下公路隧道开挖及其监控量测  被引量:8

The Excavation and Measurement of Highway Tunnel under Complex Geologic Conditions

在线阅读下载全文

作  者:杨林德[1] 潘洪科[1] 王志义 

机构地区:[1]同济大学地下建筑与工程系,上海200092 [2]浙江大地交通工程建设有限公司,浙江台州317300

出  处:《中南公路工程》2006年第3期1-5,37,共6页Central South Highway Engineering

基  金:交通部西部交通建设科技项目(200231800022);上海市重点学科建设项目资助

摘  要:云南省大风垭口隧道是昆明-曼谷国际公路上的一座特长隧道,极其复杂的工程及地质条件使其为国内工程界所瞩目。总结和探讨了隧道建设者们在遭遇各类恶劣地质灾害时,如何运用先进的动态反馈设计与信息化施工手段,尤其重视监控量测及超前地质预报的作用,创造性地提出和灵活应用各种新方法、新工艺,安全、快速、优质地完成隧道建设。Dafengyakou tunnel in Yunnan Province, which is focused attention upon world because of its complex geologic conditions, is a super-long tunnel of the Kunming-Bangk by engineering ok international highway. In this paper, it is summarized and discussed the tunnel erectors how to use advanced means of dynamic feedback design and informing construction, especially measurement and ahead geologic prediction, and how to bring forward and apply various of new ways or new technics when encountered kinds of abominable geologic hazards, which makes tunnel construction completed safely, fast and high qualitatively.

关 键 词:特长公路隧道 复杂地质条件 监测 信息化施工 

分 类 号:U455.4[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象