检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中铁大桥局集团第二工程有限公司,江苏南京210015 [2]中铁大桥局集团有限公司,湖北武汉430050
出 处:《桥梁建设》2005年第B06期13-16,共4页Bridge Construction
摘 要:东海大桥Ⅲ标近岛段钻孔桩共有φ2.0m、φ2.5m、φ3.0m三种不同桩径,在浪高流急、风大涌强且覆盖层较浅、基岩强度极高、岩面倾斜较大的海域内进行钻孔桩施工,对于钢护筒的插打与固定、钻机的选型、钻孔桩的钻进及斜岩面的处理等方面与内河相比均有特殊之处。介绍海上钻孔桩施工的方法。The bored piles of Contract Ⅲ of Donghai Bridge close to island side have three kinds of different diameters of 2.0 m, 2.5 m and 3.0 m. The piles are constructed over sea where the waves are high and huge, current is swift, wind is strong, and the overburden on the seabed is shallow, the bed rock is extremely hard, and rock surfaces tilt a lot. Compared to the construction of bored piles over river, the construction of the piles of the Bridge is quite exceptional in aspects of setting, fixing of the pile steel casings, selection of boring machines, boring operation and handling of the tilting rock surfaces. In this paper, the methods for construction of the piles over sea are described.
分 类 号:U443.154[建筑科学—桥梁与隧道工程] U445.4[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28