对齐大山选矿厂两选指标差距的探讨  

Measures to reduce beneficiation index difference between No.1 and No.2 shops of Qidashan Beneficiation Plant

在线阅读下载全文

作  者:何晓明[1] 宋乃斌[1] 徐俊峰[1] 张强[1] 

机构地区:[1]鞍钢集团鞍山矿业公司齐大山选矿厂,辽宁鞍山114043

出  处:《矿业工程》2006年第4期41-43,共3页Mining Engineering

摘  要:通过对齐大山选矿厂改为阶段磨矿、粗细分选、重选-强磁-阴离子反浮选工艺流程后,2005年下半年一选和二选车间生产指标差距增大原因进行分析,提出缩小两选指标差距的措施。From the second half of 2005 on, the beneficiation indexes of No. 1 and No. 2 shops (they adopt the same process: stagewise grinding-rough & fine classification- gravity separation-high-intensity magnetic separation-anion inverse flotation) of Qidashan Benefieiation Plant differ from each other day by day. The reasons thereof are analyzed. Measure are taken in No. 1 shop with the goal that the benefieiation indexes of No. 1 shop become as good as those of No. 2 shop.

关 键 词:选矿 指标差距 入磨粒度 二次磨矿 重精再选 

分 类 号:TD92[矿业工程—选矿]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象