机构地区:[1]哈尔滨大电机研究所,黑龙江哈尔滨150040 [2]哈尔滨电机厂有限责任公司,黑龙江哈尔滨150040 [3]长江勘测规划设计研究院,湖北武汉430010
出 处:《大电机技术》2006年第4期31-34,55,共5页Large Electric Machine and Hydraulic Turbine
摘 要:三峡左岸6#机过速试验中出现异常振动现象,现场通过优化关闭规律,特别是延长第三段关闭时间来得以解决。本文主要介绍解决该问题的思路、方法及过渡过程工况的模型试验结果,初步认定该现象的原因为水锤现象所致,为相关电站提供了参考。During the overspeed test on the unit 6 turbine for the Three Gorges left bank power house, an abnormal oscillation problem happened and be solved by optimized the closing law, specially increase the closing time on the third time segment. In this paper, the idea, method and the model test for transient operation condition are introduced. And a conclusion that this abnormal oscillation is caused by water hummer phenomenon has been made. These experiences can be take as an reference for the relevant projects.
分 类 号:TK730.7[交通运输工程—轮机工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3