检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]黄河水利科学研究院,河南郑州450003 [2]郑州市环境监察支队,河南郑州450007
出 处:《中国水土保持》2006年第8期24-25,共2页Soil and Water Conservation in China
基 金:国家自然科学基金重大项目"基于气候地貌植被耦合的黄河中游侵蚀过程"(50239080)
摘 要:从分析无定河流域不同时段水土保持措施配置入手,以减沙效益为研究目标,探讨了水土保持措施优化配置问题。分析认为:水土保持措施配置与减沙效益是密切相关的,淤地坝在水土保持措施配置中应占有合理比例,无定河流域坝地配置比例应大于3%;坡面治理措施配置中需进一步加大封禁治理比例。The paper approaches the optimized configuration of soil and water conservation measures from the configuration of soil and water conservation measures in different time intervals of the Wuding River basin and by taking the benefits of sediment reduction as the objective of study.It considers through analysis that the configuration of soil and water conservation measures is closely related to the benefits of sediment reduction,warping dams should make up rational proportion in the configuration of soil and water conservation measures and the proportion of warping dams in the Wuding River basin should be greater than 3% and;the proportion of closing and prohibiting in treatment measures should be further increased in the configuration of slope control measures.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.135.209.180