检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]甘肃电力投资集团公司,甘肃兰州730000 [2]甘肃电投炳灵水电开发有限责任公司,甘肃永靖731600
出 处:《水力发电》2006年第7期64-66,共3页Water Power
摘 要:黄河炳灵(寺沟峡)水电站是黄河干流上的一个梯级电站,为了减少征地移民损失,经对炳灵水电站(塔坪坝址)尾水断面在刘家峡水库不同运行方式下的水位与流量关系进行分析研究,在总装机和年发电量基本不变的情况下,充分利用刘家峡水库汛限水位,将电站枢纽选址在其电站库尾内。这一举措将会使部分未利用水能资源得到开发利用,从而创造出巨大的经济效益和社会效益。The Bingling(Si gou xia) hydropower station is a series of power stations on the Yellow River, in order to the expropriation and the emigration be reduced,after studied the relation of water level and flux of the Bingling hydropower station on the Taping dam location, under the different running circumstances of the liujiaxia reservoir ,to located the Bingling hydropower station on the head of the liujiaxia reservoir ,and keeping the total installation and the generated energy not be changed all made use of the floodwater of the liujiaxia reservoir.The project will create biggest economic benefit and social benefit by all making use of the water resources.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:13.58.76.154