对炳灵水电站枢纽选址方案的研究  被引量:1

The Technical Study on the Hinge Choice of BingLing Hydropower Station on the Yellow River

在线阅读下载全文

作  者:李宁平 刘晓黎 李培义 魏同新 郝国平 

机构地区:[1]甘肃电力投资集团公司,甘肃兰州730000 [2]甘肃电投炳灵水电开发有限责任公司,甘肃永靖731600

出  处:《水力发电》2006年第7期64-66,共3页Water Power

摘  要:黄河炳灵(寺沟峡)水电站是黄河干流上的一个梯级电站,为了减少征地移民损失,经对炳灵水电站(塔坪坝址)尾水断面在刘家峡水库不同运行方式下的水位与流量关系进行分析研究,在总装机和年发电量基本不变的情况下,充分利用刘家峡水库汛限水位,将电站枢纽选址在其电站库尾内。这一举措将会使部分未利用水能资源得到开发利用,从而创造出巨大的经济效益和社会效益。The Bingling(Si gou xia) hydropower station is a series of power stations on the Yellow River, in order to the expropriation and the emigration be reduced,after studied the relation of water level and flux of the Bingling hydropower station on the Taping dam location, under the different running circumstances of the liujiaxia reservoir ,to located the Bingling hydropower station on the head of the liujiaxia reservoir ,and keeping the total installation and the generated energy not be changed all made use of the floodwater of the liujiaxia reservoir.The project will create biggest economic benefit and social benefit by all making use of the water resources.

关 键 词:水电站坝址 正常蓄水位 尾水位 炳灵水电站 

分 类 号:F282[经济管理—国民经济]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象