检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《电力系统通信》2006年第8期11-14,共4页Telecommunications for Electric Power System
摘 要:防振装置设计的好坏直接关系到线路的安全运行。针对当前我国电压等级最高的输变电线路官亭变—兰州东变750 kV输变电示范工程的大档距OPGW防振设计,文章描述了OPGW的防振措施,结合OPGW的防振锤功率特性,介绍了为750 kV送电线路大档距而设计的防振方案,并对试验结果进行评估,对此次工程的安全运行提供了可靠保证,同时也为业内人员提供一定的参考依据。Lanzhou East Substation to Guanting Substation 750 kV transmission line is the highest voltage grade demonstration project in our country. Due to the design of anti-vibration equipment would directly influence transmission line safety running, this paper discussed the anti-vibration measure of OPGW. Combined with the dampers power characteristic of OPGW, this paper introduced anti-vibration scheme for long span 750 kV transmission line. The test result was evaluated. It guaranteed safety running and provided reference.
分 类 号:TN913.33[电子电信—通信与信息系统]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28