检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:魏学成[1] 张新旭[1] 翟建明[1] 裴建忠[1]
机构地区:[1]胜利石油管理局黄河钻井总公司,山东东营257064
出 处:《石油钻探技术》2006年第4期20-23,共4页Petroleum Drilling Techniques
摘 要:为提高川东北地区的钻井速度,加快川东北地区的勘探进程,在该地区老君山构造的老君1井的钻井过程中,选择上部陆相地层进行了空气钻井技术试验并取得了成功,用时21 d安全钻进2 491.70m,机械钻速达到11.27 m/h,较常规钻井提高了10倍,为以后该地区钻井提供了新的技术选择。从井壁稳定性、地层压力和地层产出物三个方面分析了老君1井在上部地层进行空气钻井的可行性,介绍了该井空气钻井的流程、设备和详细的实施过程,分析了空气钻井过程中存在的问题及该地区今后空气钻井急需解决的问题。In order to increase drilling speed in the East Sichuan area and speed up ltS exploration progress, the upper continental formations of Well Laojun-1 located at the Laojunshan structure are tested by air drilling technology and make success. The 2 491.70 m length of hole section is finished after 21 days with an average ROP of 11.27 m/h that is 10 times higher than conventional drilling, which provides new technical options for further drilling in this area. Feasibilities of air drilling at such condition are analyzed in terms of wellbore wall stability, formation pressure, and formation outputs. In addition, this paper presents the air drilling process, equipment, detail operations, as well as technical considerations and urgent problems arised from air drilling.
分 类 号:TE242.6[石油与天然气工程—油气井工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.88