上中路隧道工程盾构出洞施工技术  被引量:2

The Shield Move-Out Construction Technique for Shangzhong Rd Tunneling Engineering

在线阅读下载全文

作  者:李章林[1] 戴仕敏[1] 黄德中[1] 

机构地区:[1]上海隧道工程股份有限公司

出  处:《上海建设科技》2006年第4期47-50,共4页Shanghai Construction Science & Technology

摘  要:出洞是大型泥水平衡盾构法隧道施工中极其重要的工序。通过对上海市上中路隧道工程盾构出洞施工中地基加固、基座安装、止水装置安装、后靠体系建立、泥水处理、同步注浆等技术的总结,以及大型泥水平衡盾构出洞施工时应注意的问题及措施,可为类似软土地基的超大型泥水平衡盾构施工提供借鉴。The shield moving-out is a kind of very important procedures in the tunnel construction with large-scale slurry balanced shield. The paper summarizes some technologies for the shield moving-out construction of Shangzhong Road Tunnel Project in Shanghai such as foundation consolidation, base installation, water-stopping fitting installation, back supporting system establishment, slurry treatment and synchronous grouting, points out attentions that should be paid in the construction of large-scale slurry balanced shield moving-out and gives countermeasures for reference to super large-scale slurry balanced shield construction for similar soft soil foundation.

关 键 词:出洞 施工工艺 泥水平衡盾构 盾构施工 

分 类 号:U455.4[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象